Contractor's License #951083 Insured & Bonded

Floor Leveling and Patching in Los Angeles, CA

Uneven floors create problems for new flooring installations, causing gaps, cracks, and premature wear. Los Angeles Hardwood Flooring Company fixes these issues through professional floor leveling and patching services using self-leveling compound, concrete leveling techniques, and surface preparation methods. Our company handles everything from minor floor patching to complete subfloor leveling across homes, offices, retail stores, and warehouses throughout Los Angeles.

With over 20 years of experience preparing floors across greater Los Angeles, we've leveled thousands of surfaces in older homes with settling foundations, commercial buildings with damaged concrete, and new construction projects requiring precise height adjustments. Our team uses advanced measuring tools to identify problem areas, then applies the right patching materials and leveling compounds to create smooth, flat surfaces.

Get a FREE Quote

Our Floor Leveling and Patching Services

Leveling

We begin every floor leveling project with a thorough assessment using specialized tools to identify low spots, high points, and uneven areas. Our technicians measure floor variances to the millimeter, ensuring precise remediation planning.


The leveling process typically involves several key steps. First, we clean and prepare the subfloor, removing any debris or old flooring materials that might interfere with adhesion.


We carefully monitor the curing process, which generally takes 24-48 hours before the floor is ready for new flooring installation. This attention to detail prevents future flooring failures and ensures a perfectly level surface.

Floor Patching

Our patching services address various floor imperfections:


  • Crack Repair: We fill and seal cracks in concrete floors to prevent moisture intrusion and further deterioration.
  • Hole Filling: Small to medium-sized holes are filled with appropriate patching compounds matched to the existing flooring material.
  • Edge Repair: We restore damaged floor edges near walls, doorways, and transitions between rooms.
  • Surface Imperfection Correction: Minor dips, divots, and rough areas are smoothed for seamless flooring installation.


For concrete floors, we utilize specialized cement-based patching compounds. Wood floor patching might involve wood fillers, epoxy compounds, or replacement of damaged sections depending on severity.

Benefits of Working With Us


High-Quality Materials 

We invest in premium materials and state-of-the-art equipment to ensure lasting results for every floor leveling and patching project. Our suppliers are carefully selected for their product quality and environmental standards. Unlike companies that cut corners with diluted compounds, we use full-strength commercial-grade leveling materials that resist cracking and deterioration. 


Expertise

Los Angeles Hardwood Flooring Company has been providing professional floor leveling and patching services throughout the Los Angeles area for years. Our technicians are certified and regularly trained on the latest techniques and materials for both residential and commercial applications. We understand the unique challenges of Southern California building structures, including seismic considerations that can affect floor stability over time. 


Customer Satisfaction

We believe that quality service extends beyond just technical expertise. Our customer-first approach means we work around your schedule, not the other way around. Before beginning any project, we provide detailed consultations and transparent quotes with no hidden fees. We understand floor repairs can disrupt your daily activities, so we work efficiently to minimize inconvenience.


Why Floor Leveling and Patching Matter


Floor leveling and patching are critical processes that ensure the structural integrity and aesthetic appeal of any flooring installation. Proper preparation of the subfloor creates a solid foundation for all subsequent flooring materials.


Floor Irregularities


Floor irregularities develop for various reasons including natural settling of buildings, moisture damage, or improper initial installation. These issues can manifest as dips, bumps, cracks, or uneven surfaces that compromise the quality of your finished floor. Over time, concrete slabs may develop cracks due to normal settling or moisture intrusion. Wooden subfloors can warp or sag between joists, creating uneven surfaces throughout the room.


Without proper correction, these irregularities transfer to your new flooring. This can lead to premature wear, gaps in hardwood or laminate, and bubbles or tears in vinyl or carpet installations. We've seen countless floors fail prematurely simply because the underlying issues weren't properly addressed before installation. Professional floor leveling can support significant weight—up to 50 lbs in some cases—providing stability for your new flooring.


Benefits of Level Floors


Level floors create a safer living or working environment by eliminating trip hazards and uneven surfaces. This is particularly important in commercial spaces or homes with elderly residents or children. Properly leveled floors extend the lifespan of your flooring materials. When weight is distributed evenly across the surface, it prevents excessive stress on specific areas that could lead to premature wear or damage.


Level surfaces also enhance the visual appeal of your space. When light hits an uneven floor, it creates shadows that highlight imperfections. A properly leveled floor reflects light evenly, creating a more polished appearance. Installation of any flooring type becomes significantly easier on a level surface. This results in fewer complications during installation and better overall performance of adhesives and locking mechanisms.

FAQs on Floor Leveling and Patching

How much does floor leveling cost in Los Angeles?

Floor leveling in Los Angeles typically costs $4-$6 per square foot for standard applications. For minor patching and leveling, expect to pay $500-$1,500 total. More extensive projects requiring structural repairs can cost $7-$12 per square foot. Concrete grinding for high spots typically runs $2-$4 per square foot, while self-leveling compound application ranges from $3-$7 per square foot depending on thickness required.

Is floor patching more affordable than complete floor replacement?

Yes, floor patching is significantly more affordable than complete replacement. Patching and leveling typically costs 30-50% of what you'd pay for full floor replacement. For example, fixing isolated areas with a self-leveling compound preserves your existing subfloor structure while addressing only the problematic areas, saving both labor and material costs.

How long does floor leveling typically take to complete?

Floor leveling typically takes 2-5 days for an average-sized room (250-300 sq ft). Small patch jobs can be completed in a single day. The timeline includes: preparation (removal of existing flooring if necessary), 1-2 days for applying leveling compounds, and 1-3 days of curing time depending on the product used and thickness applied. Larger homes may require 1-2 weeks for complete leveling.

Can I stay in my home during floor leveling work?

Yes, you can typically stay in your home during floor leveling work. The process creates minimal disruption compared to other renovations. You won't have access to the specific rooms being leveled, and there may be some dust and noise during preparation. Self-leveling compounds have low odor and VOCs compared to other construction materials. For whole-house projects, limited access might be required for 24-48 hours during curing.

How soon can new flooring be installed after leveling?

New flooring can typically be installed 24-72 hours after floor leveling, depending on the product used and environmental conditions. Traditional cement-based self-leveling compounds generally require 24 hours per 1/4 inch of thickness. Quick-setting formulations may allow for flooring installation within 16-24 hours. Always check moisture levels before installing moisture-sensitive flooring like hardwood or vinyl, as this may extend waiting time in some cases.